top of page

Our
EXPERIENCE

Enterprise Products

•  GTS packaged 4 GT-22 YORK compressor propane compressors
    driven by Allison 50kc gas turbines  


•  Turn-key project worth $12 million USD

Energy Transfer

•  Energy Transfer pipeline, largest gas pipeline in Texas is from Waxahachie, West            Texas to Katy, East Texas – 850 miles long

•  GTS retrofitted  22 GT-22  turbines with OPTO-22 control system
    and upgraded the  pipeline compressors with dry seals from John Crane

Naval Air Station - Guam USA

GTS was awarded after U.S. government bid to EPC a power plant 18 mw on the military base Naval air station, GUAM USA. The project was $20 million USD and use of Westinghouse W 191 heavy duty gas turbine, as the client didn’t want an aero derivative turbine since the island of Guam gets hit with typhoons up to 180 mph and earthquakes up to 8 Richter scale. The specifications for this plant were state of the art for 1989, as it was going to run unmanned during typhoons of  180 mph, and take earthquake up to 8 Richter scale, this is very high Seismic zone similar to Japan and Marshall Islands of the Pacific.
 

GTS was provided with w 191 gas turbine only and it developed all the plant from ground up by its own engineering. The plant was built to strict specs of the U.S. Navy and GTS was awarded  excellence award for its turn-key work, 9000 miles from mainland USA .

US Navy power plant / Marbo Naval air station - Guam, USA

us navy power plant

Admiral Larson performing opening ceremony. Both top commanders
of U.S. Navy Pacific.

Total France Refinery

GTS was awarded two compressor drives at the Total (France ) refinery in Arkansas city, Kansas to EPC two Catcracker gas compressors using  two aero derivative  gas turbines, at least 50 feet up near the Catcracker, inlet exhaust of gases.  This was first ever installation of jet engine near the Catcracker as catalyst powder, cement like and powder think, enters the gas the turbine.
 

GTS worked with American air filter in Kentucky  and developed  the latest and the greatest inlet air system,  that could separate the fine catalyst particles from entering the gas turbine inlet and damage the blades. The job was over $15 million USD and EPC for GTS in 1987.

Fiatavio in Torino, Italy

GTS along with  FIATAVIO  of Torino, Italy was awarded EPC for $140 million USD, 140 mw, combined cycle  power plant by USA company coastal  power inc. to EPC in Pakistan, TURN-KEY, using  Aero LM6000  GE  gas turbine in combined cycle power plant. This plant was first for GE in 1999, to have a power plant in sub-continent with their LM 6000 Aero gas turbine. GTS worked with W.A.P.D.A the monopoly utility of Pakistan, to convince them that aero derivative gas turbines are as reliable as heavy duty  industrial very heavy gas turbines. 

 

Fiat Avio was the lead  company with their billion-dollar company resources and GTS supplied man-power installation expertise and country knowledge to Italians. GTS Engineers supervised the civil works, mechanical erection, and electrical work for FIAT AVIO. This project of over $100 million USD was the largest moneywise project done by GTS till 1999.

Petrobras

GTS Controls Inc. had 17 gas turbines of OEM Man Turbo, Germany with Petrobras, the monopoly of Brazil for oil and gas business. GTS built for Petrobras an open architecture, PLC 5  software to control the gas turbine and SCADA for the Hispano Suiza, TBH gas turbines offshore Brazil. The job was over $10 million USD and done on time.

We show our capability and strengths to be an independent company that doesn’t depend too much on the OEM, except for the specifications of their gas turbines.

GTS engineers have over 200 years of gas turbine experience together to be able to engineer design a power plant utilizing a Kawasaki gas turbine.

 

GTS Drilling Company

First ever Chinese rig send off from China to USA. GTS Drilling brought this rig to Colorado, USA

gts drilling company

GTS - E Fleet for Fracking

• E-Fracking driven by  3500 KW, 13.8 KV,60 HZ. This is new technology, for oil & gas upstream

• GTS provided this high-tech fracking company in Colorado, with  6/3500 KW mobile gas turbine generators, to run 10,000 PSIG, 6000 HP electric AC motors frack pumps 

 

• It is the latest technology  to be deployed in the upstream oil & gas business GTS pioneered this technology, as GTS used the largest Frac pump 6000 HP, AC motors, with 13.8 KV VFD systems 

 

• GTS started this project in 2016 and continues now in 2021

e fleet for fracking

Contact Us Now

713-208-3781 / 832-443-3358

tim@gtstxturbines.com

 

10783 Stidham Rd 

Conroe, TX 77302, USA

Thanks for submitting!

© 2024 General Turbine Systems of Texas, Inc.

bottom of page